No Dig drilling mud capacity always smaller and some drillings may need 150GPM capacity. Many solids control equipment manufacturer focus on oil&gas drilling and shakers aways have capacity minimum 400GPM. GN Solids Control bring in a Mini shale shaker with 200GPM capacity to meet Mini capacity requirement on No Dig Drilling.
GN mini shale shaker install 2 pc mini shaker screen, it’s availeble to install desilter cone to comby a mini mud cleaner for second phase cleaning. Does it cool?