CBM drilling mud cleaning method

GN exported a hydraulic jack up Mud Cleaning System for international client. It’s a customized technique with customized colour, logo, and nameplate.
Capabilities with the CBM drilling Mud Cleaning System
1) It is a self lifting program with 4 hydraulic jack-up legs. Through shipment, it can be no want crane machine. The approach is usually lift by itself. Truck drive back below the mud cleaning approach tank at CBM drilling web page, then the technique can fall down by itself for the truck for rapidly movement.
2) It’s a 3-stage solids handle method for CBM drilling rigs
Quite very first stage solids handle: shale shaker
Third stage solids manage: desilter. There is no desander machine applied inside this CBM program.
For any far more compact system and to lessen total cost from the plan, GN engineer group improvement a double deck shale shaker mounted collectively with desilter cones. It is only a footprint of a shale shaker, and combined the function of a shale shaker also to a mud desilter.
Forth stage solids deal with: infant centrifuge, specially made for mining and CBM drilling field.
Agitating and Mixing system: the strategy is complete with agitating and mud mixing approach. Together with total lighting and electrical handle system, it’s a “turn the key” resolution for CBM Mud Cleaning System contractors.

Gn mud cleaning system post history as below:

drilling mud recycling system

GN solids creat numerous types of drilling mud system

No Dig 500GPM Mud Cleaning System To CPP

500GPM mud cleaning system is the very tipical size for No Dig drilling rig. GN just finished 2 sets 500GPM No Dig mud cleaning system to CPP and ready for delivery next week.

Why A Mud Cleaning System Wil Be Required For Drilling Rig?

  1. To separate drilling cuttings our from drilling mud, so that it can be re-used to save cost
  2. To add new chemicals and keep mud suitable density and viscosity
  3. Environment requirement make you hard to get rid of dirty mud only clean water

Standard Parts And Requirement For No Dig Mud Cleaning System From CPP

  1. One set GNZS703 shale shaker with max 7.5 G force and 3 pc shaker screen
  2. One set GNZJ703 mud cleaner with one desander cone and 8 desilter cones
  3. 2 sets centrifugal pump sit on tank sid for mud transfer
  4. One set mud tank with compact desigh for small footprint
  5. Walkways and handrails that can be folded on tank side
  6. Control panels fix on tank without disassemble when moving

Please visit GN Web for details equipment spec and more news

1000HP Drilling Rig Solids Control Equipments

1000HP drilling rig will require solids control equipment for drilling mud recycling and storage. GN just finished one set to Poland end of last month.

Before design a set of solids control system, you need confirm bellowing questions:

  1. Mud flow requirement. This need confirm to choose shale shaker and desander desilter
  2. If vacuum degasser required
  3. How many set of decanter centrifuge require
  4. High speed decanter centrifuge or middle speed or both?
  5. Mud tank holding capacity needed
  6. Mud tank dimention limit and requirement
  7. Mud tank compartment required
  8. Jobsite layout and jard limit to design mud tank layout
  9. Mud suction line size and outlet position to suilt mud pump
  10. If need tank roof or not
  11. Other special request

GN Solids is one of the leading solids control eqipment suppllier, please contact us freely for inquiry or techinical.

Gn desander equipments in Houston

desander, Shale shaker,desilter produced by GN solids control can be used for solids removal projects, whatever the project is, if only you need to remove big solids from the fluids/mud/slurry, these equipments can help. Depends on the different mesh size, the shale shaker can separate different points. In the traditional solids control system, shale shaker can separate 400 microns, desander can dispose sands and some small waste, desilter cone can separate 25 microns and decanter centrifuge is the last cleaning phase which can separate fine solids up to 2 microns.

For non- solids control projects, if you would like to analyse if desander can be used for your projects, you need to answer the questions below:

1 What is the biggest solids size in the slurry/fluids?

2 What is the minimum solids size remained in the desander?

3 What is the solids content by weight?

4.all desander Manual also is GN desander Codes & Standards?

Extra questions will be required according to different application. Welcome to contact GN solids America.

What Is The Drilling Mud System Application?

Drilling mud system is well used in drilling industry, but what a drilling mud system do and what’s the applications?

Drilling mud system is working for solids separation from driling mud and control mud density and viscosity for re-use, so it’s named drilling mud recycling system. But why a mud system should do this job?

  1. Suitable drilling mud will help keep well pressure
  2. Drilling mud will connect with oil&gas directly, suitable mud will help protect oil and gas
  3. There normally contains oil and other chenimcals in drilling mud, so mud system will help to recycling and re-use to decrease polution
  4. Drilling mud will help bring drilling cuttings out
  5. Drilling mud help cool down drill bit
  6. According to drilling mud change, people can help know info under ground in well

A Drilling Mud System Contains:

  1. Drilling mud recycling machine like shale shaker, desander, desilter and decanter centrifuge.
  2. Mud tanks for mud storage and transfer
  3. Mixer for mixing new drilling mud for re-use
  4. Mud agitator to avoid mud settling down