150GPM Mud Recycling And Mixing Tank System Sold To Australia

Normal
0

7.8 磅
0
2

false
false
false

EN-US
ZH-CN
X-NONE

/* Style Definitions */
table.MsoNormalTable
{mso-style-name:普通表格;
mso-tstyle-rowband-size:0;
mso-tstyle-colband-size:0;
mso-style-noshow:yes;
mso-style-priority:99;
mso-style-parent:””;
mso-padding-alt:0cm 5.4pt 0cm 5.4pt;
mso-para-margin:0cm;
mso-para-margin-bottom:.0001pt;
mso-pagination:widow-orphan;
font-size:10.5pt;
mso-bidi-font-size:11.0pt;
font-family:”Calibri”,”sans-serif”;
mso-ascii-font-family:Calibri;
mso-ascii-theme-font:minor-latin;
mso-hansi-font-family:Calibri;
mso-hansi-theme-font:minor-latin;
mso-bidi-font-family:”Times New Roman”;
mso-bidi-theme-font:minor-bidi;
mso-font-kerning:1.0pt;}

GN sold one set 150GPM mud recycling and mixing tank system at Gold Coast show in Aug for horizontal directional drilling ( HDD ) rig which will be drilling at west Australia.

Main Equipments And Technical For GN 150GPM Mud Recycling And Mixing Tank System

Normal
0

7.8 磅
0
2

false
false
false

EN-US
ZH-CN
X-NONE

/* Style Definitions */
table.MsoNormalTable
{mso-style-name:普通表格;
mso-tstyle-rowband-size:0;
mso-tstyle-colband-size:0;
mso-style-noshow:yes;
mso-style-priority:99;
mso-style-parent:””;
mso-padding-alt:0cm 5.4pt 0cm 5.4pt;
mso-para-margin:0cm;
mso-para-margin-bottom:.0001pt;
mso-pagination:widow-orphan;
font-size:10.5pt;
mso-bidi-font-size:11.0pt;
font-family:”Calibri”,”sans-serif”;
mso-ascii-font-family:Calibri;
mso-ascii-theme-font:minor-latin;
mso-hansi-font-family:Calibri;
mso-hansi-theme-font:minor-latin;
mso-bidi-font-family:”Times New Roman”;
mso-bidi-theme-font:minor-bidi;
mso-font-kerning:1.0pt;}

The chose double deck shale shaker for first and second phase cleaning by install 3×4”desilter cones on shale shaker. The bottom deck will run 40-80mesh shaker screen for first phase cleaning and top deck running 120-200mesh screen for drying solids out of desilter cones

A small mixer including mixing pump and mixing hopper includinged, mixing hopper sited on tank top while mixing tank on tank sikid, we make a 1.5m door on handrail beside mixing hopper for pallet travel while mixing

4m long mud tank divided 2 compartments, the first one is a sand trap bellow shale shaker and the second one is a mixing compartment bellow mixing hopper. Tank ground have 5 degree angle to enable mud discharge and clean better

Mud gun installed on mixing compartment for agitator purpose as no agitators installed because of limit space. Mud gun line goes on side pipe which is powered by mixing pump

There is a T outlet at mixing pump outlet to enable mixing pump working as a transfer pump if needed. This is not requested by clients but GN supply this idear to give clients more choice and convenience while working with GN mud recycling and mixing tank system on jobsite

GN Solids Will Show 150GPM Mud System At Drill 2014 In Australia

GN Solids Control is one of the leading solids control equipment manufacturer in China and supply a complete mud system for Australia. GN will take part in Drill 2014 to show a 150GPM mud system

Advantages Of GN 150GPM Mud System Designed For Australian Drillers

  1. 4 m long mud tank with 2m wide and 1.3m high for fast moving with container locks and fock lift points
  2. GNZS703 double deck shale shaker with top   deck drying solids from desilter and bottom deck for first phase cleaning
  3. 3×4" desilter cone to separate solids above 20 microns
  4. 11kw SB4x3   centrifugal pump to feeding desilter cones and another same pump for mixing chemicals and feeding mixing hopper
  5. 2" mud gun installed at mixing compartment 

Drill 2014 At Gold Coast In Australia

  1. Drill 2014 is organized by ADIA and held in Gold Coast this year
  2. Many clients in Coal Seam Methan and Diamond Drilling industdry will come and visit stand to source machines
  3. There will be many drilling rig suppliers, mud pump suppliers, solids control equipments suppliers and other related tools and machine supplier come to show there equipments
  4. Exhibition started at Aug 19 till Aug 21 with 3 days showing

GN took part in Drill 2012 in Adlaide 2 years ago and will have more activities in Australia to improve GN equipments, pls feel free to contact us

No Dig 500GPM Mud Cleaning System To CPP

500GPM mud cleaning system is the very tipical size for No Dig drilling rig. GN just finished 2 sets 500GPM No Dig mud cleaning system to CPP and ready for delivery next week.

Why A Mud Cleaning System Wil Be Required For Drilling Rig?

  1. To separate drilling cuttings our from drilling mud, so that it can be re-used to save cost
  2. To add new chemicals and keep mud suitable density and viscosity
  3. Environment requirement make you hard to get rid of dirty mud only clean water

Standard Parts And Requirement For No Dig Mud Cleaning System From CPP

  1. One set GNZS703 shale shaker with max 7.5 G force and 3 pc shaker screen
  2. One set GNZJ703 mud cleaner with one desander cone and 8 desilter cones
  3. 2 sets centrifugal pump sit on tank sid for mud transfer
  4. One set mud tank with compact desigh for small footprint
  5. Walkways and handrails that can be folded on tank side
  6. Control panels fix on tank without disassemble when moving

Please visit GN Web for details equipment spec and more news

What Is The Drilling Mud System Application?

Drilling mud system is well used in drilling industry, but what a drilling mud system do and what’s the applications?

Drilling mud system is working for solids separation from driling mud and control mud density and viscosity for re-use, so it’s named drilling mud recycling system. But why a mud system should do this job?

  1. Suitable drilling mud will help keep well pressure
  2. Drilling mud will connect with oil&gas directly, suitable mud will help protect oil and gas
  3. There normally contains oil and other chenimcals in drilling mud, so mud system will help to recycling and re-use to decrease polution
  4. Drilling mud will help bring drilling cuttings out
  5. Drilling mud help cool down drill bit
  6. According to drilling mud change, people can help know info under ground in well

A Drilling Mud System Contains:

  1. Drilling mud recycling machine like shale shaker, desander, desilter and decanter centrifuge.
  2. Mud tanks for mud storage and transfer
  3. Mixer for mixing new drilling mud for re-use
  4. Mud agitator to avoid mud settling down

Surat Basin Energy And Mining Expo In Australia

Surat Basin Energy And Mining Expo will be held in Toowoomba showgrounds on 18th &19th Jun. It makes good sense to exhibit:

  1. Network with like minded businesses
  2. Develop new business relationships face to face
  3. Build market awareness
  4. Generate additional sales and leads
  5. Accelerate the sales process
  6. Good to show solids conotrol equipment there
  7. Company listing in the Surat Basin Guide Publication
  8. Company listing in the Exhibitor Online Directory

GN Show 150GPM Mud System There

  1. 150GPM mud flow capacity mud system
  2. 6000 liters mud tank capacity
  3. Mixing application is availeble
  4. Double deck shale shaker for better performance
  5. Mud gun for agitating
  6. Centrifugal pump for mud transfer

Please contact GN Solids freely for inquiry or further information to come and visit our stand.